How Is Artificial Grass Installed? Step-by-Step Guide

Short answer

Professional artificial grass installation involves removing the existing turf and soil to around 75–100mm, fitting edging, laying and compacting a crushed stone sub-base, adding a fine levelling layer, laying a weed membrane, then rolling out the grass, cutting it to shape, joining seams with tape and adhesive, fixing the edges, spreading kiln-dried sand or other infill and brushing the pile up.

How Is Artificial Grass Installed? Step-by-Step Guide

Step 1: Survey and planning

A good installation starts before anything is dug. The installer measures the area, checks access, looks at levels and drainage, and decides which way the grass will be laid. Artificial grass has a direction to its pile, and it looks best when the pile faces the main viewing point, usually the house. Rolls come in set widths, often 4 metres, so the layout is planned to keep joins to a minimum and away from heavy-use areas.

This is also when the grass product is chosen. Pile height, density, yarn colours and backing type all affect both the look and how well it suits your use, whether that is dogs, children or a show lawn.

Step 2: Excavation and edging

The existing lawn is stripped, usually with a turf cutter, and the soil is dug out to the depth needed for the base, typically around 75–100mm on a normal garden. Roots, stones and debris are removed. Heavy clay or poorly draining ground may need going deeper or adding drainage.

Edging is then installed around the perimeter where the lawn does not meet a hard edge such as a wall or patio. Treated timber, steel, plastic or concrete edging holds the base in place and gives something to fix the grass to. Without it, the edges can sink and the grass can lift over time.

  • Turf removed with a turf cutter
  • Soil dug out to around 75–100mm
  • Roots, stones and debris cleared
  • Edging fitted where there is no hard edge
  • Waste removed by a registered waste carrier

Step 3: Building the sub-base

The sub-base is what keeps the lawn flat and free-draining for years. A layer of crushed stone, often Type 1 or a clean, free-draining aggregate, is spread and compacted with a wacker plate in layers. On top goes a finer layer, typically granite dust or grit sand, which is screeded and compacted to create a smooth, even finish with a slight fall so water does not pool.

Compaction is critical. A base that is not compacted properly will settle unevenly, leaving dips that show through the grass. Experienced installers check levels repeatedly with a straight edge as they go.

LayerTypical materialPurpose
Sub-baseCrushed stone, compactedStrength, stability and drainage
Laying courseGranite dust or grit sandSmooth, level surface for the grass
MembranePermeable weed membraneStops weeds growing up from below
Artificial grassTurf with perforated or permeable backingFinished surface
InfillKiln-dried sand or specialist infillWeighs grass down, supports the pile

Step 4: Membrane and laying the grass

A permeable weed membrane is laid over the laying course to stop weeds growing up from below while letting water drain through. Some installers place a second membrane under the laying course too. The grass rolls are then unrolled, ideally left to relax for a while so creases settle out, and positioned so the pile runs the right way.

The grass is cut to shape with a sharp knife from the back, following edges, borders and paths. Cutting accurately at the perimeter is one of the skills that separates a professional finish from a DIY one, as gaps or overlaps at the edges are very obvious.

Step 5: Joining, fixing and infill

Where two pieces of grass meet, the edges are trimmed so the stitch rows line up and the gap is consistent. Joining tape is laid underneath, adhesive is applied, and the two edges are pressed down carefully so no fibres are trapped. A well-made join should be almost invisible.

The edges are then fixed, usually with galvanised nails or pins into timber edging, or adhesive against hard edges. Finally, kiln-dried sand or a specialist infill is spread evenly over the surface and brushed in with a power brush. The infill weighs the grass down, helps it stay flat and supports the fibres so they stand upright.

How to prepare for installation day

A little preparation helps the team start straight away and keeps the job on schedule. Clear the lawn of furniture, pots, toys and anything stored on it. If a shed or play frame needs moving, agree in advance whether you or the installer will do it. Make sure the access route is clear, whether that is a side passage, garage or hallway, and protect floors and walls if materials must come through the house.

Agree where the skip or waste bags and the delivery of stone can go. A driveway is ideal, as tonnes of aggregate will usually arrive on a lorry and be moved by barrow. If you need a skip on the road, a permit from the council may be needed, and the installer can usually advise. Let neighbours know about the work, especially if the turf cutter or wacker plate will be noisy for a day or two.

If you have pets, plan where they will stay while the garden is dug up, as there will be open ground, machinery and gates left open.

How long installation takes

A typical back garden of 40–80m² usually takes two to three days, depending on access and how much digging and waste removal is needed. Small gardens and lawns laid on concrete may take a day. Gardens reached only through the house, with all materials carried by hand, take longer.

Through us, you can request quotes from vetted, insured local installers who follow this full process, so your lawn stays flat, drains well and looks good for years.

Questions people also ask

Do you need a sub-base for artificial grass?

Yes, for laying on soil. A compacted crushed stone sub-base with a fine laying course keeps the lawn flat and free-draining. Laying straight onto soil or sand leads to dips, puddles and weeds. The exception is laying on sound concrete or paving, where a foam shock pad is used instead.

Which way should artificial grass face?

Artificial grass usually looks best when the pile faces towards the house or the main viewing point, because you see the fuller face of the fibres. All pieces in a lawn must face the same way, otherwise joins show up as different shades. Installers plan the layout before cutting.

Can artificial grass be laid in winter?

Yes, as long as the ground is not frozen or waterlogged and it is dry enough to work. Adhesives for joins need suitable temperatures to cure properly, so installers may plan around very cold spells. Many lawns are laid outside summer without any problems.

Written and checked by the Artificial Grass Installation team. Read our editorial policy.